After running power out to the garage it was time to move the servers out and re-rack them. It all went pretty well…

Here’s the mess at the back of the rack before I stripped it out:

Once all the cabling was stripped out:

Testing the 2U cable dump panel for the power cables:

And covered up:

Seems to work nicely but I only have one at the moment and I need that for the network cables:

Power cables re-run using standard 1U cable management bar:

Network leads patched in (2 for each ESXi server, 1 for the WHS 2011 server, 2 for IPMI and 1 running back to the house- hopefully to be replaced shortly by 2 fibre LAG):

And covered up:

Front of the rack (bit of a rubbish photo, but you can see none of the equipment has any front connections, also quite a lot of redundant gear):

L